20mm Crushed Stone
₹ 700.00 Ex-Factory
CRUSHING OPERATIONS
Stage 01
The Boulders produced from Quarry process Operated Mines are fed to the Primary Jaw Crusher to crush it in to smaller pieces. It is then fed to the Secondary Cone Crusher.
Stage 02
The crushed boulders from the Primary Jaw Crusher are fed to the Secondary Cone Crusher for further reduction in order to achieve desired size
Stage 03
Our 3 deck high frequency Screen in each crusher ensures uniform gradation and smooth product finish of Aggregates of varying sizes
Stage 04
The Aggregates are then crushed in a 55 tonnes / hour VSI Crushing Plant which is then passed into a Classifier where the segregation and washed to obtain Manufactured Sand (M-Sand ) for Concrete and Plaster sand (P-Sand) for fine Plastering